Serving Atlanta and all of Fulton County, Georgia
Sewer pipe lining in Atlanta
A sewer lateral in Atlanta spends its life in red clay that swells every wet winter and shrinks every dry summer, under the roots of oaks that were here before the house. Most of those lines can be rebuilt from inside, through a cleanout, without touching the slab, the lawn or the street.
Sewer Pipe Lining (CIPP)
A resin-saturated liner cured in place forms a new, jointless pipe inside the old one.
Sewer Pipe Lining (CIPP) in Atlanta →
Pipe Bursting
A bursting head splits the old pipe while pulling new HDPE pipe in behind it, through two small pits.
Pipe Bursting in Atlanta →
Sewer Camera Inspection
See what is actually wrong before anyone quotes a fix.
Sewer Camera Inspection in Atlanta →
The pipe beneath a Atlanta property
Metro Atlanta grew in rings, and the sewer laterals follow those rings. The in-town neighborhoods platted before 1940 were piped with terracotta or vitrified clay in short lengths, a joint every couple of feet, and each joint is a door for roots. The ranch tracts that filled Fulton County from the 1950s through the 1970s were plumbed with cast iron under the slab and clay or cast iron out to the street, and a share of those subdivisions got Orangeburg, a tar-impregnated fiber product that goes soft, bubbles and loses its round profile with age. PVC took over in the 1980s; it does not rust or rot, but a joint can separate and a section can be crushed or sag where the fill was never compacted.
All of it sits in Georgia red clay, a kaolinitic soil that swells when the winter rains soak it and shrinks hard when a dry August bakes it. That cycle works the pipe joints open a fraction at a time. Add the water oaks, willow oaks, magnolias, crepe myrtles and Bradford pears that line older streets, and a lateral that was tight in 1965 has usually been breached somewhere by now. In parts of the metro, granite bedrock sits close enough to the surface that any trench becomes a rock-breaking job.
How a cured-in-place liner works
Cured-in-place pipe, or CIPP, is a new pipe formed inside the failing one. The crew records the line with a camera, then jets it with high-pressure water to strip roots, scale and grease back to the pipe wall. A felt or fiberglass tube wet out with resin is pulled or inverted into the cleaned pipe from the cleanout, pressed to the wall by air or water pressure, and hardened with steam, circulating hot water or UV light into one rigid, continuous pipe. Roots have no joint left to probe, groundwater has nothing to seep through, and the smooth bore moves waste better than the rough clay or scaled iron did.
Because the liner goes in through the existing cleanout or one small access pit, the slab stays intact, the crawlspace is not excavated, and the sidewalk and road are untouched. That matters most for the run under the public right-of-way, where open-cut work means a separate permit, traffic control and a paving patch. the verified installer covering Atlanta handles lining throughout metro Atlanta and north Georgia.
When the line should be burst instead
A liner can only follow a pipe that still has a shape. When the camera shows a collapsed section, a sag holding water, flattened Orangeburg, or a pipe undersized for the fixtures feeding it, lining would just set the problem in resin. Pipe bursting replaces the lateral along the same path: a cone-shaped head winched between two small pits fractures the old pipe outward and drags new high-density polyethylene behind it. Nothing between the pits is disturbed, and the new pipe can be one size larger than the old one. A side-by-side account of both methods is at the CIPP reference.
The inspection is not optional
Every trenchless job worth doing in Fulton County begins with a recorded camera run and ends with another one. The first locates each defect by distance from the cleanout and marks its depth with a sonde; the second, after the cure, proves the new pipe is sound from end to end. Ask for both recordings and a written finding before anyone quotes a repair, and expect the quote to cite the method and the footage behind it. Anyone who names the fix before the camera has been in the pipe is selling, not diagnosing. The standards a verified installer is held to are listed at the verified installer directory.
What the day looks like
Lining a house lateral in Atlanta normally takes one working day, in any season: cleaning and measuring first, then the liner goes in and cures around midday, reinstatement of branch connections and the final video in the afternoon. Expect the water to be off for a few hours while the resin hardens; the crew tells you the window beforehand. On low-lying lots, the same visit is a good time to install a backwater valve, so a main surcharged by a summer thunderstorm cannot send sewage back toward the house. The cured liner comes with a written warranty and a fifty-year design life, which is the document a buyer, a lender or a home inspector will ask to see later.
Who we work for in Atlanta
Residential
Laterals under houses, yards, driveways and slabs — most are lined in a day.
Residential pipe lining in Atlanta →
Commercial
Restaurants, retail, offices and multifamily: longer runs, grease, after-hours scheduling.
Commercial pipe lining in Atlanta →
Industrial
Plants, campuses and municipal lines: large diameters, process drains, storm culverts.
Industrial pipe lining in Atlanta →
Questions we hear in Atlanta
Is my Atlanta sewer lateral a candidate for lining?+
Usually, yes. A liner needs a host pipe that is still round and still running downhill. Clay with root intrusion at the joints, cast iron rusted along the invert, and Orangeburg that is bubbled but still round all take a liner well. A caved-in run, a long low spot holding water, or a pipe undersized for the building needs pipe bursting. The camera inspection is what settles it.
Does Georgia clay affect how a sewer line is repaired?+
It affects why the line failed and what happens after. Red clay expands when saturated and contracts when dry, so joints in clay and cast iron laterals open and offset a little more each year. A one-piece liner has no joints to pull apart, and because the ground is never opened there is no backfill to settle later. On lots where granite sits a few feet down, avoiding the trench is also the difference between a day of work and a week of hammering rock.
What permits are needed for lateral work in Atlanta?+
The city or county building department issues the plumbing permit that covers the lateral itself. If any part of the work reaches the sidewalk or the street, a right-of-way permit is needed as well, and some jurisdictions want the sewer utility to witness the tie-in at the main. The contractor files for both and schedules the inspections.
Who is responsible for the lateral out to the main?+
It depends on where the property is. Inside the central city, owners are responsible for the whole lateral, including the length under the sidewalk and street. Several suburban counties maintain the portion inside the right-of-way and leave the rest to the owner. The contractor confirms the rule for Atlanta ahead of scheduling so you are not paying for a section the utility owns.
How do I get a quote?+
Phone us or fill out the form. A camera inspection is the first visit; you get the video and a written description of what it shows, and the quote is written from that footage instead of a guess. Estimates are free; call now.